Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8710236

- Product Categories
- Friendly Links
- home > Supply > Renovated in 2012 Wuchang, Hankou and Optical Valley plant plant design and decoration prices
Information Name: | Renovated in 2012 Wuchang, Hankou and Optical Valley plant plant design and decoration prices |
Published: | 2012-03-13 |
Validity: | 90 |
Specifications: | The Wuhan construction Decorative Arts |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Company: Wuhan built Arts and Decoration Design Engineering Co., Ltd. Main: Wuhan office decoration - Wu Hangong installed company | - decoration, Wuhan Hotel | Wuhan plant decoration of Wuhan mall decoration | Wuhan supermarket decoration | Wuhan school renovation | Wuhan sauna decoration | Wuhan nursery decoration | Wuhan sales department renovation | Wuhan cafe decoration | Wuhan restaurant decoration Decoration Tel: 13971108901 Learn more, please visit: www.jyzs027.com Wuhan hotel refurbishment, Wuhan plant decoration to discuss the renovation contracts Renovation contract is the most important legal documents in the renovation works. When all design and engineering budgets are negotiated before the start of the renovation a necessary formalities. At present, some of the more mature managed the city's Construction Committee, or the establishment of the Bureau will have a standard contract. No matter how, or introduce me. Signed home renovation contract, we must first know the composition of renovation contracts local. 1, the main project: (a) the title of the construction site. This is the main body of the implementation of the contract. (b) A and B both sides title. This is the object of the execution of the contract. 2 projects: including serial number, project title, specifications, unit of measure, quantity, unit price, pricing, together, Remarks, etc.. This local majority attachment included in the project budget, the offer table. 3 Project duration: duration of a few days, such as liquidated damages. 4, method of payment: payment practices rules. 5 engineering obligations: on the construction process in a variety of quality and peace obligation to bear to make the rules. 6, the two sides signed set: sign set, including both sides representative signature and date, including the seal of the company as a company party. |
Admin>>>
You are the 26667 visitor
Copyright © GuangDong ICP No. 10089450, Wuhan Art Decoration Engineering Co., Ltd. was built All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26667 visitor
Copyright © GuangDong ICP No. 10089450, Wuhan Art Decoration Engineering Co., Ltd. was built All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility